Property | Description |
---|---|
Cache Directory | Directory where Data Integration creates the data cache and index cache files. By default, Data Integration stores the cache files in the directory entered in the Secure Agent $PMCacheDir property for the Data Integration Server. If you change the cache directory, verify that the directory exists and contains enough disk space for the cache files. To increase performance during cache partitioning, enter multiple directories separated by semicolons. Cache partitioning creates a separate cache for each partition that processes the transformation. Default is $PMCacheDir. |
Rank Data Cache Size | Data cache size for the transformation. Select one of the following options:
Default is Auto. |
Rank Index Cache Size | Index cache size for the transformation. Select one of the following options:
Default is Auto. |
Tracing Level | Detail level of error and status messages that Data Integration writes in the session log. You can choose terse, normal, verbose initialization, or verbose data. Default is normal. |
Transformation Scope | The method in which Data Integration applies the transformation logic to incoming data. Select one of the following values:
Default is All Input. |
Case Sensitive String Comparison | Specifies whether Data Integration uses case-sensitive string comparisons when it ranks strings. To ignore case in strings, disable this option. Default is enabled. On an advanced cluster, comparisons are always case-sensitive. |
Optional | Determines whether the transformation is optional. If a transformation is optional and there are no incoming fields, the mapping task can run and the data can go through another branch in the data flow. If a transformation is required and there are no incoming fields, the task fails. For example, you configure a parameter for the source connection. In one branch of the data flow, you add a transformation with a field rule so that only Date/Time data enters the transformation, and you specify that the transformation is optional. When you configure the mapping task, you select a source that does not have Date/Time data. The mapping task ignores the branch with the optional transformation, and the data flow continues through another branch of the mapping. Default is enabled. |