Message Reference > P Message Codes > PETL Messages
  

PETL Messages

PETL_24042 The Preparer DTM has timed out after waiting <time in seconds> seconds for the Master DTM to connect.

Explanation:
The master DTM process was unable to connect with the preparer DTM process. The master DTM process may have shut down unexpectedly. The master DTM process may be on another node and there may be a network failure.
User Response:
View the workflow log to see if the DTM process started on the node. If the DTM process started and shut down unexpectedly, the error is internal. If the error is not internal, contact the Network Administrator to verify that the network does not have connectivity issues. Contact the domain Administrator to verify that the Integration Service is running. Run the session again.

PETL_24045 The Master DTM failed to connect to the Preparer DTM.

Explanation:
The master DTM process failed to connect to the preparer DTM process. There may be a network failure and the master DTM and preparer DTM processes are running on different nodes. The preparer DTM process may have shut down unexpectedly.
User Response:
View the workflow log to see if the DTM process started on the node. If the DTM process started and shut down unexpectedly, the error is internal. If the error is not internal, contact the Network Administrator to verify that the network does not have connectivity issues. Contact the domain Administrator to verify that the Integration Service is running. Run the session again.

PETL_24046 The Master DTM timed out after <time in seconds> seconds while trying to connect to the Preparer DTM.

Explanation:
The master DTM process timed out attempting to connect with the preparer DTM process. The master DTM and the preparer DTM processes may be running on separate nodes and there is a network failure. The preparer DTM process may have shut down unexpectedly.
User Response:
View the workflow log to see if the DTM process started on the node. If the DTM process started and shut down unexpectedly, the error is internal. If the error is not internal, contact the Network Administrator to verify that the network does not have connectivity issues. Contact the domain Administrator to verify that the Integration Service is running. Run the session again.

PETL_24048 The Master DTM failed to fetch the prepared session from the Preparer DTM.

Explanation:
The master DTM process was unable to connect with the preparer DTM process. The master DTM and preparer DTM processes may be on separate nodes and there may be a network failure. The preparer DTM process may have shut down unexpectedly.
User Response:
View the workflow log to see if the DTM process started on the node. If the DTM process started and shut down unexpectedly, the error is internal. If the error is not internal, contact the Network Administrator to verify that the network does not have connectivity issues. Contact the domain Administrator to verify that the Integration Service is running. Run the session again.

PETL_24049 Failed to get the initialization properties from the master service process for the prepare phase <error message> with error code <error code>.

Explanation:
The preparer DTM process was unable to retrieve run time properties from the Integration Service due to an error.
User Response:
Use the returned error code error message to determine the cause of this error.

PETL_24061 The Master DTM exceeded the maximum wait time while waiting for all Worker DTMs to connect.

Explanation:
The master DTM process waited longer than the maximum amount of time allotted to wait for worker DTM processes to connect. The node running the worker DTM process may have failed, or connectivity to the worker DTM process may have failed. Or, the worker DTM process may have shut down unexpectedly.
User Response:
View the workflow log to see if the DTM process started on the node. If the DTM process started and shut down unexpectedly, the error is internal. If the error is not internal, contact the Network Administrator to verify that the network does not have connectivity issues. Contact the domain Administrator to verify that the Integration Service is running. Run the session again.

PETL_24063 The Preparer DTM encountered error <error message> with error code <error code> while notifying the Integration Service of the prepare phase status.

Explanation:
An error prevented the preparer DTM process from connecting to the Integration Service.
User Response:
Use the returned error code message to determine the cause of this error.

PETL_24064 Thread <thread ID> waited for <time in seconds> seconds for a message. The current number of attempts is <attempt number> and the maximum number of attempts is <maximum number of attempts>.

Explanation:
An error prevented the preparer DTM process from connecting to the Integration Service.
User Response:
Use the returned error code message to determine the cause of this error.

PETL_24065 Error: Thread <thread name> exceeded the maximum wait time while waiting for a reply from the Master DTM.

Explanation:
A worker DTM process waited longer than the maximum amount of time allotted to wait for a reply from the master DTM process.
User Response:
View the workflow log to see if the DTM process started on the node. If the DTM process started and shut down unexpectedly, the error is internal. If the error is not internal, contact the Network Administrator to verify that the network does not have connectivity issues. Contact the domain Administrator to verify that the Integration Service is running. Run the session again.

PETL_24066 The Master DTM connection with the Worker DTM running partition group <partition group ID> was broken unexpectedly. The Master DTM will abort processing.

Explanation:
The master DTM process detected that a worker DTM process failed unexpectedly.
User Response:
View the workflow log to see if the DTM process started on the node. If the DTM process started and shut down unexpectedly, the error is internal. If the error is not internal, contact the Network Administrator to verify that the network does not have connectivity issues. Contact the domain Administrator to verify that the Integration Service is running. Run the session again.

PETL_24067 The Worker DTM connection with the Master DTM terminated unexpectedly. The Worker DTM will stop processing the session.

Explanation:
The worker DTM process detected that a connection to the master DTM process failed. The master DTM process and worker DTM process may be on different nodes and there may be a network failure.
User Response:
View the workflow log to see if the DTM process started on the node. If the DTM process started and shut down unexpectedly, the error is internal. If the error is not internal, contact the Network Administrator to verify that the network does not have connectivity issues. Contact the domain Administrator to verify that the Integration Service is running. Run the session again.

PETL_24072 Error: Thread <thread name> failed to get a reply from the Master DTM.

Explanation:
Internal error. The Master DTM process failed to respond to the thread due to any of the following reasons: network failure, maximum CPU usage, a maximum number of processes on the node, or no available ports.
User Response:
Contact the network administrator to verify that the network does not have connectivity issues. Contact the domain administrator to verify that the Integration Service is running. Run the session again. If the issue exists, then contact Informatica Global Customer Support.

PETL_24074 Failed to send updates to the master service process. Session run will be terminated.

Explanation:
The master DTM process was unable to send updates to the master service process.
User Response:
View the workflow log to see if the DTM process started on the node. If the DTM process started and shut down unexpectedly, the error is internal. If the error is not internal, contact the Network Administrator to verify that the network does not have connectivity issues. Contact the domain Administrator to verify that the Integration Service is running. Run the session again.