Note the following guidelines and considerations for using Open Table targets:
•When you run an incremental load or a combined initial and incremental load task with the Open Table target, sub-tasks might take significantly longer than expected to appear in the monitoring interface. This delay does not affect initial load tasks. To work around this issue, run the Amazon Athena OPTIMIZE and VACUUM commands on the recovery table to compact snapshot files and expire old snapshots.
•Database ingestion and replication tasks that have Open Table targets do not allow schema drift with Drop Column and Rename Column options.
•For incremental load and combined load jobs that use the Standard or Soft Deletes apply mode, the task generates merge and write queries to apply changes to the Open Table target for source tables with multiple primary keys or no primary key. For tables with no primary key, all columns must be logged in the source database, and the connector matches rows using all column values.