Business Process Management
Workflows for Product 360 Versions 10.1
A new best practice workflow example is available with Version 10.1.
We strongly encourage to check out the corresponding Informatica BPM Accelerator.
This best practice workflow, if followed, provides significant better overall performance and reduction on
the load for all system components, especially the BPM server itself. However, no automatic migration to this workflow is possible,
but a manual adjustment is required.
Previously existing workflows should still work fine, with one exception. In case the fieldChangeInfo elements of the ItemModified
trigger payload is used, the workflow needs to be adjusted as this payload has changed. See also BPM Queue
Workflows for Product 360 versions >= 8.0.00
Workflow processes designed with the Informatica BPM Designer for the Product 360 versions 8.0.00 to 8.0.03 do not have to be migrated.
However, a new default workflow is required for the new "Terminate workflow" functionality and needs to be deployed to the Informatica BPM server (see Informatica BPM Installation).
Workflows for Product 360 versions < 8.0.00
Workflow processes designed with the jBPM workflow engine for Product 360 versions earlier than version 8.0.00 cannot automatically be migrated and deployed to the Informatica BPM server.